THE WEATHER IN BENIDORM NOW

15

10:21 AM

TIME IN BENIDORM

19ºC

Cloudless sky

NE 25km/h

WIND DIRECTION AND SPEED

5%

CHANCE OF SHOWERS

SELECT A PORTAL

CITIZEN

Information to live in the city

COMMUNICATION

Press, Radio and TV

FILM OFFICE

Office of filming

SMART CITY

Indicators of our destination

EUROPEAN FUNDS

Actions co-financed by the EU

CHOOSE YOUR PREFERENCES

SELECT A LANGUAGE FOR THIS COMPUTER OR DEVICE

Current size: 100%

ADJUST THE FONT SIZE
ADJUST THE CONTRAST SIZE

The action is valued at around 700,000 euros and it is intended to be carried out next year

The JGL approves the renovation project for Roma Avenue

19 October 2020
The JGL approves the renovation project for Roma Avenue...

The Local Government Board (JGL) has approved today the project of 'Renewal of drinking water and sanitation infrastructures in Roma Avenue', which also includes the adaptation of the urban scene, road and sidewalks of this 320-meter long road length, located in the upper area of ​ Rincón de Loix neighborhood.

The Councilor for Works and the Water Cycle, José Ramón González de Zárate, explained that “with the approval of the project, the City Council is now in a position to start the bidding process for this work, which is expected to be carried out next year and with the one that we advance in the renovation, updating and improvement of the urban scene and infrastructure of the upper part of Rincón de Loix ”.

De Zárate recalled that "in the previous legislature we adopted the commitment to invest in updating this neighborhood, with a marked residential and tourist character, and we did so with the remodeling of Ametlla del Mar avenue, renovating all the infrastructures hydraulic systems and solving the historical flood problems that occurred in the area. Once this renovation was carried out, we were able to start updating the streets of the upper area, starting with London and Paris, where we have already operated, and continuing with Rome ”.

The mayor has detailed that “the approved project contemplates the renovation of all hydraulic infrastructures, acting on the drinking water, waste and rainwater network, and also significantly improving aesthetics, accessibility and lighting.

Among the actions included in this project, valued at around 700,000 euros, is the updating of the drinking water network, and the construction of a new wastewater collector and another for rainwater. In addition, the road is renewed and the size and width of the sidewalks are increased to facilitate pedestrian mobility. A linear green area is also generated in parallel to the south sidewalk of the avenue, and the public lighting network is renewed, installing LED technology to reduce consumption.

CONTACT

Benidorm Film Office is located on the 3rd floor of Benidorm Town Hall in the plaza of SSMM los Reyes de España s / n.

You can contact us or send your suggestions to filmoffice@benidorm.org or phone 966815436 or 648036771

Our schedule is from Monday to Friday, from 8:00 a.m. to 3:00 p.m.