THE WEATHER IN BENIDORM NOW

22

16:31 PM

TIME IN BENIDORM

17ºC

Cloudy intervals con lluvia escasa

N 5km/h

WIND DIRECTION AND SPEED

70%

CHANCE OF SHOWERS

SELECT A PORTAL

CITIZEN

Information to live in the city

COMMUNICATION

Press, Radio and TV

FILM OFFICE

Office of filming

SMART CITY

Indicators of our destination

EUROPEAN FUNDS

Actions co-financed by the EU

CHOOSE YOUR PREFERENCES

SELECT A LANGUAGE FOR THIS COMPUTER OR DEVICE

Current size: 100%

ADJUST THE FONT SIZE
ADJUST THE CONTRAST SIZE

One lane remains for the exit, facilitating entry through Avenida Bernat de Sarrià to Toledo and Ciudad Real streets

Impact on traffic on Avenida Severo Ochoa

25 August 2021
Ayuntamiento de Benidorm.
Ayuntamiento de Benidorm.

This morning there was a break in the impulsion line to the sewage treatment plant in the basement of Avenida Severo Ochoa at the height of Calle Napoles, which caused the fracture of the road and the rapid intervention of the Municipal Technical Services and Aqua Ambiente company to control the scope of the same and enable repair solutions and traffic through the road.

Where the breakdown occurred, there has been a wash of soil that affects the stability of the terrain, which is why a section of Avenida Severo Ochoa leading to the sidewalk, bike lane and side of parking lots has been perimeter, maintaining only one traffic lane in the exit direction along said road at the height of Camping Arena Blanca towards the intersection Bernat d'en Sarriá-tourist road CV753, Rotonda de Orozco.

The direction of entry can be made through Admirall Bernat de Sarrià Avenue through Toledo and Ciudad Real streets to connect with the urban fabric of Severo Ochoa Avenue, with two-way traffic, not affected by the break that is being repaired at this time, also working on the consolidation of the land to proceed with the total recovery of the road to provide it with two-way traffic conditions.

The Department of Works, prudence is requested in the circulation in the area, speeding up the work to return to normality, with total security, in the shortest possible time, keeping information on the development of the works continuously through municipal channels.