THE WEATHER IN BENIDORM NOW

22

21:28 PM

TIME IN BENIDORM

16ºC

Very Cloudy

C 0km/h

WIND DIRECTION AND SPEED

25%

CHANCE OF SHOWERS

SELECT A PORTAL

CITIZEN

Information to live in the city

COMMUNICATION

Press, Radio and TV

FILM OFFICE

Office of filming

SMART CITY

Indicators of our destination

EUROPEAN FUNDS

Actions co-financed by the EU

CHOOSE YOUR PREFERENCES

SELECT A LANGUAGE FOR THIS COMPUTER OR DEVICE

Current size: 100%

ADJUST THE FONT SIZE
ADJUST THE CONTRAST SIZE

Benidorm culminates the project of the footbridge that will connect Italia street with Palau d'Esports and Parque de la Séquia Mare

20 June 2017
Benidorm culmina el proyecto de la pasarela que unirá la calle Italia con el Palau d’Esports y el Parque de la Séquia Mare

The mayor explained in the Neighborhood Council the details of this action, included in the participatory budget and that creates a safe route saving the ravine

Benidorm City Hall has already shaped how the footbridge and pedestrian cycle walkway that will join Italia street with Palau d'Esports l'Illa and with the upper part of the future Park of the Séquia Mare saving the ravine and Comunidad Europea avenue . A project that is included in the accounts of 2017 within the Participatory Budget, and that will allow to securely join Els Tolls neighborhood with the sports and leisure facilities of Palau and the Séquia Mare Park .

The mayor, Toni Pérez, today has transferred to the members of the Neighborhood Council the details of this project drafted by the municipal technicians, which was already reported to the corporation on Monday in an informational commission of Urbanism.

This project contemplates the construction of a steel walkway of 20 meters in length on the ravine, and the creation of four axles through which bicycles, pedestrians and emergency vehicles can circulate - each road with a width of 4 meters.

Three of the axes will receive a final treatment similar to that recently given to the small park that has been generated at the confluence of Dr. Orts Llorca and Esperanto avenues, with a polished concrete similar to the terrazzo. The fourth path, which will link with Parque de la Séquia Mare, will be covered with ocher-colored resin and achieve a better adaptation to the environment.

Pérez stressed that when designing this footbridge and pedestrian crossings have taken into account "the promotion of sustainable mobility" and also "the infrastructures that are planned in the area and that will be developed in the medium term." Specifically, the mayor has referred to Parque de la Séquia Mare and the intermodal station announced by the Generalitat Valenciana, which will be located next to the bus terminal and will serve the TRAM. In fact, the project presented today has been coordinated with Ferrocarrils of the Generalitat Valenciana (FGV).

The municipal project, which will be tendered shortly, is valued at 285,000 euros and has a term of execution of three months.